Less than 60 Days Until Settlement...

Another beautiful Saturday in Virginia, and we're now less than 60 days until our settlement. It was blazing hot today, but we took a few snapshots of the house (you can see the front with the garage door down for the first time) below:

Our circuit breaker is in the works just inside of our garage door and some of the insulation has been put in.

You can see some of the insulation in our garage here:

In addition to the garage, we saw that our family room has begun to be insulated, and the frames for the recessed lights that we added are in.

This is what the frames for the recessed lights look like:


In our soon-to-be kitchen where Chef Brian will cook some tasty cuisine, we noticed that the vent has been moved over top of where our stove will be.


Upstairs, more insulation has been put in. Here's a photo of the master bedroom. You can also see the framing for the tray ceiling we'll have.

Next week the drywall will begin. We'll keep you posted once we have some walls. Until then, go team USA soccer:-)

Tuesday, June 8, 2010

Shutter Time

A few days later, and we now have shutters! Our black shutters have been put up ahead of schedule, and it looks like things are moving along.


In addition to the shutters, the copper roofing has been put on our side bay windows

The builders have also started on our siding too. We have a light beige colored siding, which you can see in progress here:


Here's another angle of the progress until this Saturday when we'll head out to Aldie to watch the World Cup US vs. UK game!

Thursday, June 3, 2010

It's a Brick....House!

Today we met with Matt, our project manager, to conduct the pre-drywall meeting. It was about 94 degrees and we were sweating, but I'm sure that was nothing compared to how the 5+ workers felt after laying bricks all day in the sun. See below for the first shots of our Virginia Highlands Brick with Red Wire Cut accent.


During the pre-drywall meeting, we walked through each room of our house with Matt and a guy named Dale from Trinity Wiring to point out where we want our electric outlets, recessed lights, cable, phone, and ethernet drops, and security system wiring. Here's a photo in one of the bedrooms upstairs. You can see Matt in the shadow on the right, and the workers through the window.

We're nearly within 60 days of closing, so fingers crossed, the construction will keep moving along. We thought there was a snafoo with our brick selection since we had no idea what Williamsburg brick was, but it turns out it's just being used to supplement the Red Wire Cut accent brick around the windows and the garage door.


Here's one more shot of the house with the scaffolding. We were told that the roof would be complete tomorrow, and by Saturday, our brick should be finished.

Monday, May 24, 2010

Aldie at Night

Surprise! We decided to take a drive out to check progress on our house only 2 days since our last post. It was dusk and we could hear the crickets chirping...a far cry from city living in Old Town, Alexandria!

In the last few days it looks like some more of our windows have been installed and some more housing wrap added. We walked through our house to check on progress too. Here's a photo of our family room. You can see where our fireplace will be, along with 3 new windows that were installed.

Here's another view of the windows in the family room:


Brian decided to climb the stairs to check out the upstairs of our new home.


We'll leave you with a sneak peek of our dining room. You can see the sunset where our bay window will soon be.

Saturday, May 22, 2010

From the Ground Up!

Unbelievably, in only 6 days since our last post, we can already see the framing of our house! When we turned onto our street and Brian said "there it is," I replied, "that's not our house," but it was!

Here's a closer look at the framing around our garage:

As you can see, the framing has been put in place, along with the trusses. Some windows have been delivered too.



Our doors have also been delivered onsite. We can see our double basement door at the top of the pile.

As you can see, there are a lot of building materials on our lot.

There's also some NV Homes wrap on our house. See the view from the back of our house below.

We also snapped a few photos (below) of the inside of our basement. You can see the progress since last week.

Another view of the inside of our basement:

We're excited about being soon-to-be homeowners!

Sunday, May 16, 2010

More Than Just a Dirt Hole!

Quite a bit has happened on Lot 15 in the last week! Our driveway has been scoped out with gravel...


...and now we have a dirt slab where our garage will soon be.

Our foundation footings and walls are also complete.

Since we have a walk out basement, we decided to upgrade to full size windows and a double basement door. You can see the windows and door framed out in the photos of the foundation walls.


Here's another view:

Our plumbing groundworks were also installed this week and passed inspection. Although we're not finishing our basement right now, we had the builder rough in the plumbing for a bathroom in the basement and a wetbar.


Here's a view of the foundation walls from the side:

Another view of the basement foundation from the back of the lot:

Me peeking through what will soon be a full size window in our basement!


If you walk in our basement from the backyard, this is what you will see. The bathroom will be in the back left corner and the wet bar to the right ahead of you.


If you come in from the backyard and look to the right, you'll see this:


Here's Brian surveying the progress:


And in case you didn't know it, I like to drive bulldozers in my spare time....

Next week, we're told that our slab will be poured and framing might even begin! Until then, we'll leave you with a sneak peak at our backyard...just imagine green grass...and BBQs!

Saturday, May 8, 2010

Our Great Big Hole in the Ground


We drove out to check out progress on our lot and discovered that there's quite a bit underway.




Aside from a big hole where our house will be, there's a concrete outline of our foundation...



There are also some spoke-like things that have been put in place.


We also noticed 5,000 pounds of concrete that has been delivered to our lot. The foundation should start being poured next week.

Looks like our neighbor's house to the right of ours (a Ryan home) is coming along too.

Sunday, May 2, 2010

Staking out the Lot


It's official...the building process has begun! Our building manager, Matt, e-mailed to let us know that our lot has been staked out and the builders are ready to excavate early next week (weather permitting). Over the next few weeks our foundation, plumbing groundworks, sewer and water connections to the main will be installed, and the builders will pour our slab in preparation for framing.