This is what the frames for the recessed lights look like:
Upstairs, more insulation has been put in. Here's a photo of the master bedroom. You can also see the framing for the tray ceiling we'll have.
This is what the frames for the recessed lights look like:
Upstairs, more insulation has been put in. Here's a photo of the master bedroom. You can also see the framing for the tray ceiling we'll have.
In addition to the shutters, the copper roofing has been put on our side bay windows
The builders have also started on our siding too. We have a light beige colored siding, which you can see in progress here:
Here's another angle of the progress until this Saturday when we'll head out to Aldie to watch the World Cup US vs. UK game!
During the pre-drywall meeting, we walked through each room of our house with Matt and a guy named Dale from Trinity Wiring to point out where we want our electric outlets, recessed lights, cable, phone, and ethernet drops, and security system wiring. Here's a photo in one of the bedrooms upstairs. You can see Matt in the shadow on the right, and the workers through the window.
We're nearly within 60 days of closing, so fingers crossed, the construction will keep moving along. We thought there was a snafoo with our brick selection since we had no idea what Williamsburg brick was, but it turns out it's just being used to supplement the Red Wire Cut accent brick around the windows and the garage door.
Here's one more shot of the house with the scaffolding. We were told that the roof would be complete tomorrow, and by Saturday, our brick should be finished.
In the last few days it looks like some more of our windows have been installed and some more housing wrap added. We walked through our house to check on progress too. Here's a photo of our family room. You can see where our fireplace will be, along with 3 new windows that were installed.
Here's another view of the windows in the family room:
Brian decided to climb the stairs to check out the upstairs of our new home.
As you can see, the framing has been put in place, along with the trusses. Some windows have been delivered too.
Our doors have also been delivered onsite. We can see our double basement door at the top of the pile.
As you can see, there are a lot of building materials on our lot.
There's also some NV Homes wrap on our house. See the view from the back of our house below.
Aside from a big hole where our house will be, there's a concrete outline of our foundation...
There are also some spoke-like things that have been put in place.
We also noticed 5,000 pounds of concrete that has been delivered to our lot. The foundation should start being poured next week.